Project: Complete modernization of six plants belonging to the Valley of Mexico Water Basin Authority, Cutzamala System, with an integrated substation protection and automation system.

Objective: Total replacement of 55 protection, control, and metering panels, engineering and operation consoles, and SCADA systems for the operation of the following plants:Plant 1: Villa de Colorines, Valle de Bravo, State of Mexico.

Plant 2: Tilostoc, Valle de Bravo, State of Mexico.

Plant 3: Tilostoc, Donato Guerra, State of Mexico.

Plant 4: Tilostoc, Donato Guerra, State of Mexico.

Plant 5: Los Berros, Villa de Allende, State of Mexico.

Plant 6: Villa de Allende, State of Mexico.

Benefits
1. Integrated system under IEC 61850 standard specifications.
2. Turnkey project including pre-engineering, dismantling of existing systems, supply of the complete IEC 61850-based system, disconnection, installation, connection, and commissioning of the integrated substation protection and automation system.