Project: Modernization of two 10 MVA electric arc furnaces in power and control systems for Compañía Minera Autlán.
Objective: Supply of primary equipment, hydraulic equipment, control panels, power panels, OLTC, dismantling of the entire existing system, engineering design, installation, connection, and commissioning of the complete system, including the HMI system for complex operation.
Benefits
1. Best price option.
2. Customizable technology according to the client’s needs.
3. Training as an added value.
4. Turnkey project.