At IBERDROLA’s PIER wind farms, in southeastern Puebla, ABCONTROL supplied the protection, control and metering (PC&M) panels and the supervisory control for the substations of the PIER B and PIER IV wind farms, between 2018 and 2019.
The supply included:
- Transmission line protection sections.
- Transformer protection sections: TR1 at PIER B, and TR1 and TR2 at PIER IV.
- Bus differential protection sections.
- Disturbance recorder with station services.
- Inverter, SCADA and HMI sections at each substation.
- Metering sections at PIER B.
In this project, as in all our projects related to interconnection with the National Electric System (SEN), ABCONTROL provides solutions aligned with Annex 3 of the Grid Code, “General Provisions for Generator Interconnection (INTG),” and Annex 5, “General Provisions for Smart Electrical Grid (REI).”
“Thanks to the service-oriented approach of our staff and the trust that IBERDROLA MÉXICO placed in ABCONTROL, we continue making #smartpservice the best choice for #protectionservices for electrical substations.”