Project: Modernization of the Northern Regional Transmission Management Substation.
Objective: Replacement of 12 protection, control, and metering panels at the 230 kV Gómez Palacio Electrical Substation of the Northern Regional Transmission Management.
Benefits
1. Integrated system under the IEC 61850 standard.
2. Optimized to use the minimum possible amount of control wiring.
3. Project includes engineering, supply of protection, control, and metering panels, and comprehensive factory testing.