Protection and control system for a static reactive power compensator at Nuevo Vallarta Substation as part of the “306 SE 1803 Western Substation” project.

Client: NR ELECTRIC USA, LLC.

Objective: Supply of protection, control, and metering panels, as well as the SCADA system, to protect and control a 150 MVAR inductive static reactive power compensator installed at Nuevo Vallarta Substation.

Últimos proyectos

Expansion of the Envases Universales Plant. León, Guanajuato.

Expansion of the Peñafiel Bottling Plant. Tecámac, State of Mexico

Construction of Electrical Infrastructure for Agua Saludable para La Laguna. Sapioris and León Guzmán, Durango.

Expansion of Hydrometallurgical Plants at Buenavista del Cobre, Grupo México.

Complete modernization of six plants of the Valley of Mexico Water Basin Authority, Cutzamala System, with an integrated substation protection and automation system.

Modernization of the Northern Regional Transmission Management Substation.