Certificación ESR

Project: Low Voltage Distribution Systems for the Mexico-Tuxpan highway system.

Objective: Supply of IEC distribution boards for power distribution, lighting, and control systems for tunnels and highways within the highway system.

Benefits
1. Manufacturing in compliance with IEC 61439 standards.
2. Customization according to the client’s needs from the engineering phase.
3. Local support for commissioning and communication protocol integration.

 

 ABB México, Constructora FCC, SCT

ABB Mexico, FCC Construction Company, SCT.

Project: Low Voltage Distribution Systems for the Mexico-Tuxpan highway system.

Objective: Supply of IEC distribution boards for power distribution, lighting, and control systems for tunnels and highways within the highway system.

Benefits
1. Manufacturing in compliance with IEC 61439 standards.
2. Customization according to the client’s needs from the engineering phase.
3. Local support for commissioning and communication protocol integration.

 

 ABB México, Constructora FCC, SCT

ABB Mexico, FCC Construction Company, SCT.

Last Projects

Expansion of the Envases Universales Plant. León, Guanajuato.

Expansion of the Peñafiel Bottling Plant. Tecámac, State of Mexico

Construction of Electrical Infrastructure for Agua Saludable para La Laguna. Sapioris and León Guzmán, Durango.

Expansion of Hydrometallurgical Plants at Buenavista del Cobre, Grupo México.

Protection and control system for a static reactive power compensator at Nuevo Vallarta Substation as part of the “306 SE 1803 Western Substation” project.

Complete modernization of six plants of the Valley of Mexico Water Basin Authority, Cutzamala System, with an integrated substation protection and automation system.

Last Projects

Expansion of the Envases Universales Plant. León, Guanajuato.

Expansion of the Peñafiel Bottling Plant. Tecámac, State of Mexico

Construction of Electrical Infrastructure for Agua Saludable para La Laguna. Sapioris and León Guzmán, Durango.

Expansion of Hydrometallurgical Plants at Buenavista del Cobre, Grupo México.

Protection and control system for a static reactive power compensator at Nuevo Vallarta Substation as part of the “306 SE 1803 Western Substation” project.

Complete modernization of six plants of the Valley of Mexico Water Basin Authority, Cutzamala System, with an integrated substation protection and automation system.