Modernización total de 6 plantas del organismo de cuenca aguas del valle de México, sistema Cutzamala, con sistema integral de protección y automatización de subestaciones

Complete modernization of six plants of the Valley of Mexico Water Basin Authority, Cutzamala System, with an integrated substation protection and automation system.

Objective: Complete replacement of 55 protection, control, and metering panels, engineering and operation consoles, and SCADA systems for plant operations:

Plant 1: Villa de Colorines, Valle de Bravo, State of Mexico.

Plant 2: Tilostoc, Valle de Bravo, State of Mexico.

Plant 3: Tilostoc, Donato Guerra, State of Mexico.

Plant 4: Tilostoc, Donato Guerra, State of Mexico.

Plant 5: Los Berros, Villa de Allende, State of Mexico.

Plant 6: Villa de Allende, State of Mexico..

Latest Projects

Expansion of the Envases Universales Plant. León, Guanajuato.

Expansion of the Peñafiel Bottling Plant. Tecámac, State of Mexico

Construction of Electrical Infrastructure for Agua Saludable para La Laguna. Sapioris and León Guzmán, Durango.

Expansion of Hydrometallurgical Plants at Buenavista del Cobre, Grupo México.

Protection and control system for a static reactive power compensator at Nuevo Vallarta Substation as part of the “306 SE 1803 Western Substation” project.

Modernization of the Northern Regional Transmission Management Substation.