Water Conveyance and Treatment Industry.
Scope: Construction of a switching substation in compliance with CFE standards, featuring a main bus and transfer bus arrangement with 5 bays at 115 kV, 13 km of 115 kV transmission lines, a 30 MVA step-down substation at 115 kV/13.8 kV, and a 6 MVA backup power generation system.

