Motores e Ingeniería MexMot, Constructor, Residencia General de operación de Sistema

Motores e Ingeniería MexMot, Contractor, General Operations System Management.

Project: Complete modernization of six plants belonging to the Valley of Mexico Water Basin Authority, Cutzamala System, with an integrated substation protection and automation system.

Objective: Total replacement of 55 protection, control, and metering panels, engineering and operation consoles, and SCADA systems for the operation of the following plants:Plant 1: Villa de Colorines, Valle de Bravo, State of Mexico.

Plant 2: Tilostoc, Valle de Bravo, State of Mexico.

Plant 3: Tilostoc, Donato Guerra, State of Mexico.

Plant 4: Tilostoc, Donato Guerra, State of Mexico.

Plant 5: Los Berros, Villa de Allende, State of Mexico.

Plant 6: Villa de Allende, State of Mexico.

Benefits
1. Integrated system under IEC 61850 standard specifications.
2. Turnkey project including pre-engineering, dismantling of existing systems, supply of the complete IEC 61850-based system, disconnection, installation, connection, and commissioning of the integrated substation protection and automation system.

Latest Projects

Expansion of the Envases Universales Plant. León, Guanajuato.

Expansion of the Peñafiel Bottling Plant. Tecámac, State of Mexico

Construction of Electrical Infrastructure for Agua Saludable para La Laguna. Sapioris and León Guzmán, Durango.

Expansion of Hydrometallurgical Plants at Buenavista del Cobre, Grupo México.

Protection and control system for a static reactive power compensator at Nuevo Vallarta Substation as part of the “306 SE 1803 Western Substation” project.

Complete modernization of six plants of the Valley of Mexico Water Basin Authority, Cutzamala System, with an integrated substation protection and automation system.