Certificación ESR
IMPORTANCIA DE UN SISTEMA DE PUESTA A TIERRA

Importance of a Grounding System

Located in the municipality of El Carmen, Nuevo León, IBERDROLA’s new combined-cycle power plant became the setting where ABCONTROL’s protection and control service staff commissioned the PC&M panels and supervisory control system previously supplied for this 870 MW project. This first unit will be allocated almost entirely to supplying the private sector within the Wholesale Electricity Market (MEM).

In this project, as in all our projects related to interconnection with the National Electric System (SEN), ABCONTROL provides solutions aligned with Annex 3 of the Grid Code, “General Provisions for Generator Interconnection (INTG),” and Annex 5, “General Provisions for Smart Electrical Grid (REI).”

“Thanks to the service-oriented approach of our staff and the trust that IBERDROLA MÉXICO placed in ABCONTROL, we continue making #smartpservice the best choice for #protectionservices for electrical substations.”

Últimos proyectos

Expansion of the Envases Universales Plant. León, Guanajuato.

Expansion of the Peñafiel Bottling Plant. Tecámac, State of Mexico

Construction of Electrical Infrastructure for Agua Saludable para La Laguna. Sapioris and León Guzmán, Durango.

Expansion of Hydrometallurgical Plants at Buenavista del Cobre, Grupo México.

Protection and control system for a static reactive power compensator at Nuevo Vallarta Substation as part of the “306 SE 1803 Western Substation” project.

Complete modernization of six plants of the Valley of Mexico Water Basin Authority, Cutzamala System, with an integrated substation protection and automation system.